Arbitration and Mediation FAQs: Can I Appeal an Arbitration Award in Court?

May 21st, 2014 Arbitration Agreements, Arbitration and Mediation FAQs, Arbitration Practice and Procedure, Awards, Drafting Arbitration Agreements, Grounds for Vacatur, Nuts & Bolts, Nuts & Bolts: Arbitration, Practice and Procedure Comments Off on Arbitration and Mediation FAQs: Can I Appeal an Arbitration Award in Court?

Introduction

When a party is on the wrong end of an arbitration award that he, she or it thinks is fundamentally unfair, tainted by impropriety, or disconnected from the agreement the arbitrator was supposed to interpret and apply, the first question that comes to mind is whether there might be some form of recourse available. In court,  the usual avenue of relief from an adverse judgment or order is an appeal.

Can a losing party to an arbitration award governed by the Federal Arbitration Act (the “FAA”) appeal it in court? Since private arbitration is an alternative to public, government-sponsored court litigation, since the court system plays an important role in enforcing arbitration agreements, since both arbitration and court litigation share at least some of the same attributes and since in the U.S. procedural due process and the primacy of the rule of law are as dear to us as baseball and apple pie, it is natural to assume that one should be able to appeal an adverse arbitration award.

But one cannot—in any meaningful sense of the word—“appeal” an arbitration award to a court. In court litigation an appeal involves judicial review by an appellate court under which a panel of judges reviews trial-court rulings on questions of law independently—that is, as if the appellate court were deciding the question for itself in the first instance. The appellate court reviews the trial court’s findings of fact on a “clearly erroneous” or “clear error” standard of review, that is, paying a certain degree of deference to the finder of fact (the jury or trial judge). While appellate review thus does not involve a retrial on the merits, it is broad and searching, particularly where outcomes turn solely on questions of law.

The FAA does not authorize courts to review arbitration awards under an appellate standard of review, even if the parties consent to a court applying such a standard. Parties can agree before or after a dispute arises to an arbitration procedure that empowers another arbitrator or panel of arbitrators to review an award under an appellate or some other standard of review, but arbitration awards are subject to very limited and deferential review by courts and then only on a few narrow grounds.

The FAA Award-Enforcement Process

The FAA award enforcement process permits either party to make an application to vacate, modify or correct an award, or an application to “confirm” it, that is, enter judgment on it. Since the deadline for applying to vacate, modify or correct an award is considerably shorter than that for confirming an award, in many cases, parties who are seeking relief from the award make the initial application. If a putative challenging party does not timely seek relief, and the other party seeks confirmation after the expiration of the deadline for making an application to vacate, modify or correct the award, then the challenging party is time-barred from asserting grounds for vacatur or modification, even simply as affirmative defenses to confirmation. (See, e.g., L. Reins. & Arb. Law Forum post here.)

Let’s assume a party makes a timely motion to vacate an award. What will likely then happen is the other party will cross-move to confirm the award. The burden on the party seeking confirmation is pretty modest. Generally the party moving to confirm will need to show that the parties: (a) agreed to arbitrate; (b) consented to entry of judgment on the award; (c) appointed an arbitrator or panel of arbitrators; and (d) submitted the dispute to the arbitrators, who issued the award. The award is presumed valid and the court does not review its outcome or substance.

Once the modest prerequisites for confirmation have been established by a properly supported petition or motion to confirm an award, then the court “must grant” confirmation “unless the award is vacated, modified or corrected” under FAA Sections 10 or 11. 9 U.S.C. § 9. Thus, apart from those relatively rare cases where a party can show that the parties never agreed to arbitrate at all (and that the challenging party did not waive that defense), or perhaps never even impliedly consented to entry of judgment on the award, the only grounds on which the losing party can oppose confirmation are those set forth in Section 10 and 11.

The only exception might be if the award interprets the contract in a way that causes it to violate a well-defined and explicit public policy, or if the remedy the arbitrator awards violates the criminal law or requires one of the parties to do so. For example, one would not expect a court to enter judgment on an award that purported to authorize the prevailing party to inflict bodily harm on the losing party or vice-versa. That principle is simply an application of the contract-law rule that courts will not enforce contracts that violate public policy. See, generally, W. R. Grace & Co. v. Rubber Workers, 461 U.S. 757, 766 (1983); United Food & Commercial Workers Int’l Union v. King Soopers, 743 F.3d 1310, 1315 (10th Cir. 2014).

Continue Reading »

Re Colorado Energy Management, LLC v. Lea Power Partners, LLC: Another Appellate Division holds Construction Arbitration Award should be Vacated, but this time for Good Reason

May 10th, 2014 American Arbitration Association, Appellate Practice, Arbitrability, Arbitration Practice and Procedure, Arbitrator Vacancy, Authority of Arbitrators, Awards, Construction Industry Arbitration, Functus Officio, Grounds for Vacatur, Judicial Review of Arbitration Awards, New York State Courts, Practice and Procedure, State Arbitration Law, State Arbitration Statutes, State Courts Comments Off on Re Colorado Energy Management, LLC v. Lea Power Partners, LLC: Another Appellate Division holds Construction Arbitration Award should be Vacated, but this time for Good Reason

Introduction

In our recent post on the Merion Construction case (here), we were pretty critical of New Jersey’s Superior Court, Appellate Division, for reversing a trial court decision confirming a modified arbitration award, finding it should have been vacated and the original award confirmed. Today’s post takes a brief look at a decision by another state’s Appellate Division—New York’s Supreme Court, Appellate Division, First Department—which held that another construction-industry award should be vacated.

In Merion Construction the New Jersey Appellate Division thought the arbitrator had no authority to correct his award to reflect the rulings he intended to make on two issues the parties had submitted to him. Re Colorado Management, LLC v. Lea Power Partners, LLC , ___ A.D.3d ___, ___, 2014 N.Y. Slip Op. 01253 at 1-3 (1st Dep’t Feb. 20, 2014), held that a final arbitration award had to be vacated because the arbitrator had no authority to rule upon an issue that was not presented to him in light of the parties’ submissions and a ruling made in the same proceeding by a predecessor arbitrator.

While Merion Construction got an “F,” Colorado Management gets at least an “A-,” and perhaps even an “A.” Continue Reading »

The Tenth Tells us Time (Usually) Waits for No One: United Food & Commercial Workers Int’l Union v. King Soopers, Inc.

May 7th, 2014 Appellate Practice, Arbitrability, Arbitration Practice and Procedure, Authority of Arbitrators, Awards, Grounds for Vacatur, Judicial Review of Arbitration Awards, Labor Arbitration, Practice and Procedure, State Arbitration Law, State Arbitration Statutes, State Courts, Statute of Limitations, United States Court of Appeals for the Tenth Circuit, United States Supreme Court Comments Off on The Tenth Tells us Time (Usually) Waits for No One: United Food & Commercial Workers Int’l Union v. King Soopers, Inc.

Introduction

Arbitration is supposed to be a speedy alternative to litigation, and that is supposed to be true as respects commercial or employment arbitration governed by the Federal Arbitration Act (the “FAA”) and labor arbitration arising under the Railway Labor Act, 45 U.S.C. §§ 151, et. seq., or Section 301 of the Taft-Hartley Act (a/k/a the Labor Management Relations Act (“LMRA”)), 29 U.S.C. § 185. Arbitration awards are generally presumed to be valid, which puts the burden on challengers to establish their invalidity, at least provided the challenging party entered into a valid and enforceable arbitration agreement with the defending party.

Adjudicating a non-frivolous award challenge usually takes time, and if the challenge turns out to be valid, an order vacating the award does not usually resolve the underlying dispute, which, absent a settlement, must be resolved through further ADR or judicial proceedings. Delay is inevitable and delay undermines arbitration’s ability to compete with litigation.

The FAA and most or all state arbitration statutes try to minimize delay by not only by restricting t he scope of judicial review of awards, but also by imposing short limitation periods for vacating awards—for example, three months under the FAA and 90 days under many state arbitration statutes. See 9 U.S.C. § 12; see, e.g., N.Y. Civ. Prac. L.& R. § 7511(a); Fla. Stat. § 682.13(2); Wash. Rev. Code § 7.04A.230(2). Some state statutes impose shorter periods. See, e.g., Conn. Gen. Stat. § 52-420(b) (30 days); Mass. Gen. Laws ch. 251, § 12(b) (30 days); but see Cal. Code Civ. P. § 1288 (100 days).

By contrast, a motion or petition to confirm an award is usually subject to a longer statute of limitations. Cases governed by Chapter 1 of the FAA (e.g., domestic arbitrations between domestic parties), for example, are subject to a one-year limitation period. See 9 U.S.C. § 9.

Under the FAA, and presumably under many or most state arbitration statutes, if a party does not bring a timely petition to vacate, and the other moves to confirm after the time period for vacating an award has elapsed, then the challenging party cannot raise grounds for vacatur as defenses to confirmation, even if it does not seek an order vacating the award. See, e.g., Florasynth, Inc. v. Pickholz, 750 F.2d 171, 175-76 (2d Cir. 1984) (FAA); Kutch v. State Farm Mutual Auto. Ins. Co., 960 P.2d 93, 97-98 (Colo. 1998) (Colorado law); but see Lyden v. Bell, 232 A.D.2d 562, 563 (2d Dep’t 1996) (Where a confirmation proceeding “is commenced after the 90-day period, but within the one-year period. . . .[,] a party may, by cross motion to vacate, oppose the petition for confirmation on any of the grounds in CPLR 7511 even though his time to commence a separate proceeding to vacate or modify under CPLR 7511(a) has expired.”) (citations omitted) (New York law); 1000 Second Avenue Corp. v. Pauline Rose Trust, 171 A.D.2d 429, 430 (1st Dep’t 1991) (“an aggrieved party may wait to challenge an award until the opposing party has moved for its confirmation”) (New York law).

In United Food & Commercial Workers Int’l Union v. King Soopers, Inc., No. 12-1409, slip op. (10th Cir. Feb. 28, 2014), the United States Court of Appeals for the Tenth Circuit reminds us that the same rules apply to LMRA Section 301 labor-arbitration-award enforcement actions. Section 301 does not specify limitation periods for vacating arbitration awards, and as a general rule, courts “borrow” the most analogous state statute of limitations. See, e.g., Local 802, Assoc. Mus. of N.Y. v. Parker Meridien Hotel, 145 F.3d at 88-89 (2d Cir. 1998). In King Soopers the Tenth Circuit borrowed Colorado’s 90-day statute of limitations for vacating an award.[1]

King Soopers might be looked at as a refresher course in how important it is to act quickly and decisively when one finds oneself at the wrong end of an arbitration award that might not meet the modest criteria for summary confirmation or enforcement. While roughly nine years elapsed between the date the employee filed the grievance and the date the arbitrator issued the award, the Court, reversing the district court’s decision to the contrary, held (quite correctly) that King Sooper’s just-over-90-day delay in asserting grounds to vacate the award foreclosed it from opposing the union’s suit to enforce the award. Continue Reading »

No Good Deed Should Go Unpunished: Functus Officio and Merion Constr. Mgt., LLC v. Kemron Environmental Serv., Inc.—Part I

May 3rd, 2014 American Arbitration Association, Appellate Practice, Arbitrability, Arbitration Agreements, Arbitration and Mediation FAQs, Arbitration Practice and Procedure, Arbitration Provider Rules, Authority of Arbitrators, Awards, Construction Industry Arbitration, Final Awards, Functus Officio, Grounds for Vacatur, Judicial Review of Arbitration Awards, New Jersey State Courts, Practice and Procedure, State Arbitration Statutes, State Courts, Uncategorized Comments Off on No Good Deed Should Go Unpunished: Functus Officio and Merion Constr. Mgt., LLC v. Kemron Environmental Serv., Inc.—Part I

Courts usually err in favor of not vacating awards in close cases. As a result, Courts usually vacate awards only where there is a very clear, fundamental disconnect between the award and the parties’ arbitration agreement. Vacating an award in those circumstances enforces the parties’ agreement to arbitrate, which is exactly what the Federal Arbitration Act (“FAA”) and state arbitration codes are supposed to do. (See, e.g., L. Reins. & Arb. L. Forum post here.)

Today’s case, Merion Constr. Mgt., LLC v. Kemron Environmental Serv., Inc., No. A-2428-12T4, slip op. (N.J. App. Div. March 13, 2014), involved two disputed awards: the original arbitration award (the “Original Award”) and a subsequent, modified award (the “Modified Award”). The arbitrator (the “Arbitrator”) issued the Modified Award to correct a mistake in the Original Award, which had inadvertently omitted items of claimed damage that one of the parties had requested the Arbitrator to award. The Arbitrator said he intended to include those damage items in the Original Award. The Modified Award thus accurately reflected the parties’ agreement and submission and the Original Award did not.

Which Award should have been confirmed? Relying on the functus officio doctrine, and an American Arbitration Association (“AAA”) Rule concerning arbitral modification and correction of awards, the intermediate state appellate court reversed a trial court judgment confirming the Modified Award, and held that the Original Award should have been confirmed.

A few years back the Chief Justice of the United States Supreme Court prefaced one his opinions with the following truism: “People make mistakes. Even administrators of ERISA plans.” Conkright v. Frommert, 559 U.S. 506, 509 (2010) (Roberts, C.J.). Had Merion Construction been decided correctly, then the New Jersey appellate court might have prefaced its opinion with a similar truism: “People make mistakes. Even arbitrators.” But based on how the case was decided a more fitting preface would have been: “No good deed should go unpunished. Even those perpetrated by arbitrators.” Continue Reading »

What is the Statute of Limitations for a Reinsurance Claim under New York Law and When does it Begin to Run?

April 27th, 2014 Claims Handling, Contract Interpretation, New York Court of Appeals, New York State Courts, Nuts & Bolts: Reinsurance, Practice and Procedure, Reinsurance Claims, Statute of Limitations, United States Court of Appeals for the Second Circuit Comments Off on What is the Statute of Limitations for a Reinsurance Claim under New York Law and When does it Begin to Run?

Part III.C

Does New York Law on Implied or Constructive Conditions

Provide a Basis for Stronghold’s Conclusion?

 

New York’s six-year statute of limitations for breach of contract does not begin to run until the obligee has satisfied all express conditions to the obligor’s duty to perform. (See Parts I and II.) Part III.B explained why we believe the Second Circuit in Continental Cas. Co. v. Stronghold Ins. Co. did not correctly interpret and apply New York law when it concluded that a garden-variety notice-of-loss provision in an excess-of-loss reinsurance contract was an express condition to the extent it required the cedent to notify reinsurers of paid-loss claims and demand payment. That (we believe) erroneous conclusion enabled the Second Circuit to hold that the cedent’s breach-of-contract claims were not barred by New York’s six-year statute of limitations, even though they were based on settlements the cedent had concluded with its insureds more than six-years before the cedent commenced its action. (See Part III.A.)

At the conclusion of Part III.B we raised the question whether Stronghold might make sense under the law of implied or constructive conditions, that is, if we were to interpret it as having construed the notice-of-loss provision as an implied or constructive condition. But Stronghold fails even if it is reconceptualized that way.  Continue Reading »

ROM Management Reinsurance Mgt. Co. v. Continental Ins. Co.: Can Parties Agree State Arbitration Law Governs their Arbitration even if the Federal Arbitration Act Applies?

April 15th, 2014 Arbitrability, Arbitration Agreements, Arbitration and Mediation FAQs, Arbitration Practice and Procedure, Authority of Arbitrators, Choice-of-Law Provisions, Contract Interpretation, New York Court of Appeals, New York State Courts, Nuts & Bolts: Arbitration, Practice and Procedure, Reinsurance Arbitration, State Arbitration Law, Statute of Limitations, Stay of Arbitration, United States Supreme Court Comments Off on ROM Management Reinsurance Mgt. Co. v. Continental Ins. Co.: Can Parties Agree State Arbitration Law Governs their Arbitration even if the Federal Arbitration Act Applies?

Introduction

The Federal Arbitration Act (the “FAA”)’s ordinarily trumps state-law rules of arbitrability in state- and federal-court  disputes involving agreements falling under it.  But what happens when parties to an FAA-governed arbitration agreement have agreed that state law governs their agreement, or the enforcement of their agreement?

Odd as it may seem, the FAA allows parties to agree that state-law rules of arbitrability govern if the parties unambiguously agree that they govern, even if the result is that an issue subject to arbitration under the FAA is excluded from arbitration because of the parties’ choice of state arbitration law. That holds true so long as enforcing the parties’ choice of law does not “stand[] as an obstacle to the accomplishment and execution of the full purposes and objectives” of the FAA. See Mastrobuono v. Shearson Lehman Hutton, Inc., 514 U.S. 52, 58-64 (1995); Volt Information Sciences, Inc. v. Board of Trustees of Leland Stanford Junior Univ., 489 U. S. 468, 474-78 (1989); Diamond Waterproofing Sys., Inc. v. 55 Liberty Owners Corp., 4 N.Y.3d 247, 252-53 (2005); see, generally, Stolt-Nielsen, S.A. v. AnimalFeeds Int’l Corp., 559 U.S. 662, __, 130 S. Ct. 1758,1773-74 (2010). Because the whole point of the FAA is to promote arbitration by enforcing the parties’ arbitration agreement according to its terms, and because parties are free to clearly exclude issues from the scope of their arbitration agreement, giving effect to a applying a state-law rule of arbitrability does not contravene the FAA or its purposes and objectives. See Stolt-Nielsen, 130 S. Ct. at 1773 (“[W]e have said on numerous occasions that the central or primary purpose of the FAA is to ensure that private agreements to arbitrate are enforced according to their terms.”), 1774 (“Underscoring the consensual nature of private dispute resolution, we have held that parties are generally free to structure their arbitration agreements as they see fit[].  .  .  .  [and] may agree to limit the issues they choose to arbitrate.  .  .  .”) (quotations and citations omitted); Volt, 489 U.S. at 476-78.

In Re Rom Management Reinsurance Mgt. Co. v. Continental Ins. Co., ___ A.D.3d ___, 2014 N.Y. Slip Op. 01546 (1st Dep’t March 11, 2014).  New York’s Appellate Division, First Department (New York’s intermediate appellate court with jurisdiction over New York and Bronx Counties (i.e., New York City’s Boroughs of Manhattan and the Bronx)), succinctly demonstrated how the parties’ unambiguous agreement to apply state-law arbitrability rules can narrow the issues that the parties would have been required to submit to arbitration had FAA rules of arbitrability applied. Continue Reading »

What is the Statute of Limitations for a Reinsurance Claim under New York Law and When does it Begin to Run?

April 12th, 2014 New York Court of Appeals, New York State Courts, Nuts & Bolts: Reinsurance, Practice and Procedure, Reinsurance Claims, Statute of Limitations, United States Court of Appeals for the Second Circuit Comments Off on What is the Statute of Limitations for a Reinsurance Claim under New York Law and When does it Begin to Run?

Part III.B

Continental Cas. Co. v. Stronghold: Did the Court Correctly Apply New York Law?

Welcome to Part III.B of our multi-part reinsurance statute of limitations feature. (Links to previous installments are listed at the end of this post.)

If you’ve been following this series, then you already know that under New York law, the six-year statute of limitations begins to run on a reinsurance claim once it is settled and the cedent has the right to demand payment. This is the general rule that applies to other contracts of indemnity, including insurance contracts, but it is subject to an exception: when an insurance or reinsurance contract expressly conditions the reinsurer’s duty to perform its obligations on the presentation of a claim, the statute of limitations generally does not begin to run any earlier than the date the cedent presents the claim.

In Part III.A we summarized the facts and holding of the United States Court of Appeals for the Second Circuit’s decision in Continental Cas. Co. v. Stronghold Ins. Co., 77 F.3d 16 (2d Cir. 1996), which concluded that a garden-variety notice of loss provision in a reinsurance contact was an express condition to the extent that it required notice of paid loss, which the Court seemed to think was more important to reinsurers than prompt notice of the original insureds’ reported losses losses and their development over time.  Stronghold essentially created an express condition out of whole cloth by placing a strained interpretation on a timely notice provision identical in all material respects to one that New York’s highest court, in North River Ins. Co. v. Unigard Sec. Ins. Co., 79 N.Y.2d 576 (1992) (“Unigard I”), had held was not an express condition. And it relied on that interpretation to justify delaying the accrual of the statute of limitations on claims that were settled more than six-years before the Cedent commenced its action against the Reinsurers.

This Part III.B explains why we believe Stronghold misconstrued the notice provision, misapprehended its purpose and misapplied New York law on express conditions. Continue Reading »

Belz v. Morgan Stanley Smith Barney: Does a Petition to Vacate an FAA-Governed Award Timely Commenced in State Court Become Time-Barred Simply Because it is Removed to Federal Court?

April 6th, 2014 Arbitration Practice and Procedure, FAA Preemption of State Law, Grounds for Vacatur, Nuts & Bolts: Arbitration, Practice and Procedure, State Arbitration Law, Statute of Limitations, United States Supreme Court Comments Off on Belz v. Morgan Stanley Smith Barney: Does a Petition to Vacate an FAA-Governed Award Timely Commenced in State Court Become Time-Barred Simply Because it is Removed to Federal Court?

Part I

Belz v. Morgan Stanley Smith Barney, LLC, No. 3:13-cv-636-J-34 (MCR), slip op. (M.D. Fla. March 5, 2014), is one of those deceptively complex cases. The petitioner, successor trustee of a family trust (the “Trustee”), timely commenced under the Florida Arbitration Code (the “FAC”) in Florida state court  a petition to vacate an arbitration award by filing it within the 90-day period allowed by state law, but did not serve it until a few days after the three-month period required to vacate an award under Section 10 of the Federal Arbitration Act (the “FAA”) had elapsed. Compare Fla. Stat. §§ 682.13(2) & 682.17 with 9 U.S.C. §§ 6, 10 & 12.[1]. The petition requested an order vacating the award under both the FAA and the FAC, which allows service to be effected after expiration of the 90-day filing deadline. See Fla. Stat. §§ 682.13 & 682.17.

The respondent, a well-known securities broker-dealer (the “Broker-Dealer”), removed the case to the United States District Court for the Middle District of Florida based on the court’s diversity jurisdiction. In federal court the Broker-Dealer argued that the petition was time-barred because service was not effected within the FAA Section 12’s three-month deadline. The district court agreed and dismissed the petition as time-barred.

The district court apparently thought that, once a court determines that an arbitration agreement falls within the scope of the FAA, all of its provisions—whether substantive, procedural or a combination of the two—supersede their state law counterparts if they conflict in any way with them, irrespective of whether the conflict frustrates the purposes and objectives of the FAA. The court also seems to have thought that the state of Florida could not, independently from the FAA, declare an arbitration agreement falling under the FAA to be valid, irrevocable and enforceable under Florida substantive arbitration law, and enforce that arbitration agreement through Florida’s own statutory, summary procedures that are, for the most part, identical to those provided by the FAA, and, in any event, do not frustrate the purposes and objectives of the FAA.

Belz is deceptively complex because at first glance the case seems relatively straightforward: (a) the FAA applied to the arbitration agreement and award; (b) the FAA’s three-month statute of limitations for vacating an award is not tolled until service is effected; (c) the court determined service was not timely under the FAA; (d) the FAC’s statute of limitations, which requires only that an application for vacatur be filed within the 90-day period, did not apply because the FAA applied; and (d) therefore, the application to vacate was untimely.

But in Belz there was an “elephant in the room,” albeit one well-camouflaged by its inherent complexity: federalism—a principle reflected in the text of the FAA, in the Continue Reading »

Arbitration and Mediation FAQs: What do the Terms Arbitrable, Arbitrability, and Question of Arbitrability Mean, and Why do they Matter?

March 26th, 2014 Arbitrability, Arbitration and Mediation FAQs, Arbitration Practice and Procedure, Authority of Arbitrators, Awards, Existence of Arbitration Agreement, Grounds for Vacatur, Practice and Procedure, Small Business B-2-B Arbitration, United States Supreme Court Comments Off on Arbitration and Mediation FAQs: What do the Terms Arbitrable, Arbitrability, and Question of Arbitrability Mean, and Why do they Matter?

 Arbitrable, Arbitrability and Question of Arbitrability

If you’ve ever been unfortunate enough to be privy to a conversation about arbitration law, you probably heard things like:

“The dispute arguably falls within the scope of the agreement and is therefore arbitrable.”

Oxford expressly pointed out that none of the parties argued that consent to class arbitration is a question of arbitrability.”

“Did the parties clearly and unmistakably agree to arbitrate arbitrability? Because if they did, questions of arbitrability are arbitrable.”

Arbitration-law parlance is probably more arcane and cryptic than it has to be, but it has been with us for several decades and there’s no indication that it is likely to change any time soon. Learning it may be painful, but is usually well worth the modest effort required.

Today we’ll define in plain English some of the most bandied-about arbitration-law terms: “arbitrable,” “arbitrability” and “question of arbitrability.” And in the process we’ll try to explain why these closely-related terms are significant in matters governed by the Federal Arbitration Act (the “FAA”). Continue Reading »

What is the Statute of Limitations for a Reinsurance Claim under New York Law and When does it Begin to Run?

March 20th, 2014 Claims Handling, Contract Interpretation, New York Court of Appeals, Nuts & Bolts, Nuts & Bolts: Reinsurance, Practice and Procedure, Reinsurance Claims, Statute of Limitations, United States Court of Appeals for the Second Circuit Comments Off on What is the Statute of Limitations for a Reinsurance Claim under New York Law and When does it Begin to Run?

Part III.A

Continental Casualty Co. v. Stronghold Ins. Co.: Background

In Part II (here) we reviewed New York law pertinent to express conditions and how they can delay the accrual of the statute of limitations if the plaintiff has not satisfied them.

Now let’s turn to the U.S. Court of Appeals for the Second Circuit’s decision in Continental Cas. Co. v. Stronghold Ins. Co., 77 F.3d 16 (2d Cir. 1996), a case that features a fairly comprehensive recitation of New York’s reinsurance-related statute-of-limitations accrual rules as they existed in 1996, but did not apply New York’s express-condition rules consistently with controlling, New York Court of Appeals authority. This Part III.A summarizes what transpired in Stronghold and Part III.B will explain why we think the case not correctly decided.

The Stronghold Facts

Stronghold was a dispute between a United States cedent (the “Cedent”) and its London-Market reinsurers (the “London Reinsurers”) that arose under certain excess-of-loss treaties reinsuring medical malpractice liability policies the Cedent had issued to its hospital insureds.

In the 1980s the Cedent settled several medical malpractice liability claims on behalf of its insureds, but did not notify London Reinsurers of the underlying losses that resulted in the settlements, or present their reinsurance claims to the London Reinsurers, until sometime after the underlying claims were settled. The record apparently did not specify the date or dates on which the Cedent first notified the London Reinsurers of the settlements and demanded payment from the London Reinsurers.

The excess-of-loss treaties (the “Reinsurance Contracts”) provided that the London Reinsurers were “liable only for the excess of loss” incurred by the Cedent in excess of specified retentions of “ultimate net loss.” The contracts defined “ultimate net loss,” as “the sums actually paid in cash in settlement of losses [for] which [the Cedent] is liable.” They also featured notice of loss provisions that said “Loss, if any, under” a policy is “to be reported to [the London Reinsurers] as soon as practicable.”

The London Reinsurers denied each of the reinsurance claims during the period 1987-1990, and in 1991 the Cedent commenced an action for breach of contract in the United States District Court for the Southern District of New York. The London Reinsurers defended on late notice and statute-of-limitations grounds.

As respects the date on which the statute of limitations began to run on each reinsurance claim, the London Reinsurers argued that each claim accrued when the Cedent settled the claim with its insured. Each claim was settled more than six years before the Cedent commenced its action. According to the London Reinsurers, the Cedent was entitled to indemnity immediately upon payment of each settlement, even thought it did not demand payment from the London Reinsurers until a much later date. Alternatively, the London Reinsurers argued that even if their indemnity obligation was conditioned on the Cedent’s presentation of a reinsurance claim for payment,  each of the Cedent’s individual breach of contract of contract claims accrued on the date it became entitled to demand payment from the London Reinsurers, and that occurred each time the Cedent settled an underlying claim.

The Cedent argued that the claims accrued when the London Reinsurers allegedly breached the reinsurance contracts by refusing to pay the claims. Since the London Reinsurers did not refuse to pay the claims any earlier than 1987, and the Cedent commenced its lawsuit in 1991, the lawsuit would not be barred by the statute of limitation under the Cedent’s date-of-accrual theory.

Back in 1991, as some readers may recall, the New York Court of Appeals had not yet decided whether a reinsurer could successfully defend on late notice grounds without establishing prejudice. But in 1992, the London Reinsurers’ litigation strategy was dealt a painful blow when the New York Court of Appeals held, in Unigard Sec. Ins. Co. v. North River Ins. Co., 79 N.Y.2d 576 (1992), that unless a late notice provision expressly conditions a reinsurer’s liability for the claim on timely notice—i.e., the late notice provision is an express condition, not simply a promise—a reinsurer must establish prejudice to be relieved of liability based on the cedent’s failure to provide timely notice of a claim or occurrence.

Answering a question certified to it by the United States Court of Appeals for the Second Circuit, New York’s highest Court explained that, to be express conditions, contractual provisions must unambiguously evidence the parties’ intent to make performance of a duty conditional.[1] The New York Court of Appeals also held that the notice provision before it—which required “[p]rompt notice . . . of any occurrence or accident which appears likely to involve this reinsurance’”—was not an express condition, and that accordingly, the reinsurer in that case could not be relieved of liability for the cedent’s late notice of the loss or losses sustained and reported by the insureds, unless the reinsurer could prove it suffered prejudice as a result of the late notice.

Not too long after the New York Court of Appeals’ landmark reinsurance-law decision answering the Second Circuit’s certified question, the Second Circuit issued its own landmark decision in the Unigard case, holding, among other things, that the reinsurers were unable to establish either prejudice—i.e., “economic injury”—resulting from late notice or that the cedent acted in bad faith in failing to provide timely notice (which would have relieved the reinsurer from liability even without a showing of prejudice).[2]

The London Reinsurers apparently concluded that they could not establish the requisite prejudice to prevail on their late notice defense, a decision which apparently prompted the parties to enter into a stipulation designed to facilitate summary judgment on the merits in favor of one party or the other on the statute of limitations issue. To that end the London Reinsurers agreed to waive their late notice and all other defenses other than statute of limitations, and stipulated with the Cedent that: (a) New York law governed; (b) New York’s six-year statute of limitations applied; (c) the Cedent satisfied all conditions of the Reinsurance Contracts; (d) the Cedent had settled its claims with its insureds more than six years prior to commencing the action; and (e) the Cedent had commenced the action within six-years of the London Reinsurers’ earliest denial of any of the claims.

The parties cross-moved for summary judgment, and the district court ruled in favor of the Cedent, holding that no breach of the Reinsurance Contracts occurred until the London Reinsurers refused to pay the Cedent’s claims. The district court granted summary judgment in favor of the Cedent, holding that the Cedent’s causes of action did not accrue until the London Reinsurers denied the Cedent’s claims.

The London Reinsurers appealed to the United States Court of Appeals for the Second Circuit, which affirmed the district court’s judgment. Continue Reading »