main image

Posts Tagged ‘submission’

Class Arbitration, Absent Class Members, and Class Certification Awards: Consent or Coercion?

January 6th, 2020 Arbitration Agreements, Arbitration as a Matter of Consent, Authority of Arbitrators, Class Action Arbitration, Class Arbitration - Class Certification Awards, Clause Construction Award, Confirm Award | Exceeding Powers, Consent to Class Arbitration, FAA Chapter 1, Federal Arbitration Act Enforcement Litigation Procedure, First Principle - Consent not Coercion, Practice and Procedure, Rights and Obligations of Nonsignatories, United States Court of Appeals for the Second Circuit Comments Off on Class Arbitration, Absent Class Members, and Class Certification Awards: Consent or Coercion?
absent class members | class arbitration

On November 29, 2019 we posted Absent Class Members, Class Arbitration, Class Certification Awards, Consent, Coercion, and the Second Circuit, which discussed the U.S. Court of Appeals for the Second Circuit’s recent decision in Jock v. Sterling Jewelers Inc., No. 18-153-cv, slip op. (2d Cir. November 18, 2019) (“Jock IV”).

In Jock IV the Second Circuit reversed a district court order vacating an arbitrator’s class certification award, which the district court vacated because it made tens of thousands of absent class members part of a certified class even though none: (a) was a party to the class arbitration; (b) opted in to the proposed class; or (c) participated in or otherwise consented to the class arbitration. The Second Circuit held it was enough that the absent class members, like all other employees, had executed an identical, form pre-dispute arbitration agreement (the “Agreement”), which required the absent class members to submit, among other things, arbitrability and arbitration procedure disputes to arbitration.

Absent Class Members: The Federal Arbitration Act’s First Principle and Consent to Class Arbitration

The Federal Arbitration Act (“FAA”)’s “first principle” is that “arbitration is a matter of consent, not coercion.” Stolt-Nielsen, S.A. v. AnimalFeeds Int’l Corp., 559 U.S. 662, 678-80, 684 (2010) (citation and quotations omitted); see, e.g., Lamps Plus, Inc. v. Varela, 139 S. Ct. 1407, 1417 (2019); Granite Rock Co. v. International Brotherhood of Teamsters, 561 U.S. 287, 295 & n.7, 294 n.6 (2010); AT&T Technologies, Inc. v. Communications Workers, 475 U. S. 643, 648 (1986).

Beginning in Stolt-Nielsen,and most recently in Lamps Plus, the U.S. Supreme Court has repeatedly emphasized the importance of consent to class arbitration. In Stolt-Nielsen, the Court required a “contractual basis” for imposing class arbitration, and explained that “[a]n implicit agreement to authorize class arbitration, however, is not a term that the arbitrator may infer solely from the fact of the parties’ agreement to arbitrate.” 599 U.S. at 685.  

Most recently, in Lamps Plus the Court imposed a federal presumption against consent to class arbitration under which silent or ambiguous contract language cannot establish consent to class arbitration, and under which the FAA is deemed to preempt state-law contract interpretation rules that are not intent-based—such as contra proferentem, the rule that ambiguities are, at least in the absence of any other extrinsic evidence of intent, construed against the contract’s drafter. See Lamps Plus,139 S. Ct. at 1416-19.

The Lamps Plus presumption requires more than simply “a contractual basis” for finding consent to class arbitration. As a practical matter it means that the parties must clearly and unmistakably consent to class arbitration. (See, e.g., our Lamps Plus post, here.)

What does the Agreement Have to Say About Class Arbitration?

The Agreement is a form dispute resolution agreement that was signed by each of an employer (the “Employer”)’s many employees. By signing the Agreement the signatory Employer and employee agreed to arbitrate their disputes, “waiv[ed] [their] right to obtain any legal or equitable relief . . . through any government agency or court, and . . . also waiv[e] [their] right to commence any court action.”

The Agreement provides that the employee “may. . . seek and be awarded equal remedy” under the Agreement, that “‘[t]he Arbitrator shall have the power to award any types of legal or equitable relief that would be available in a court of competent jurisdiction[,]’ and that any claim arising thereunder will be arbitrated ‘in accordance with the National Rules for the Resolution of Employment Disputes of the American Arbitration Association.’” Jock IV, slip op. at 4 (citations omitted).

The Agreement does not purport to be, or evidence consent to, a multi-lateral agreement – i.e., a collective Agreement between the employer and all the tens of thousands of other employees. Employees signing the Agreement do not purport to assign rights or delegate duties to other nonsignatory employees, nor do they purport to confer any authority upon any nonsignatory employees to arbitrate, or otherwise act on behalf of, the signatory employee.

The Agreement did not mention class arbitration, although the Arbitrator found in a June 1, 2009 Clause Construction Award, that the Agreement implicitly permitted class arbitration. In 2011 the Second Circuit in Jock I ruled that the arbitrator’s award should have been confirmed because, by finding that the language of the agreement implicitly permitted class arbitration, the arbitrator had at least arguably interpreted the contract.

The Jock IV Court said that the absent class members were bound by the Clause Construction Award even though they were never parties to the class arbitration, the Clause Construction Award, the certification award, or any of the Federal Arbitration Act enforcement proceedings (including Jock I, II, III, or IV, or any of the district court proceedings), and even though they never opted in to the class or otherwise consented to any of the arbitration or arbitration-related proceedings.

The Jock IV Court said that was so because each of the absent class members had signed an Agreement identical to the ones signed by the class representatives and employees who had opted into the class, and had agreed to submit arbitrability disputes to an arbitrator.

Further, said the Court, the absent class members could not collaterally attack the Clause Construction Award because the Agreement clearly and unmistakably authorized an arbitrator to decide both arbitrability questions and questions concerning procedure. Consequently, the absent class members were not entitled to a de novo determination of whether they consented to class arbitration, which, under Lamps Plus, would require the class arbitration proponents to demonstrate that the parties clearly and unmistakably consented to class arbitration.

What Result if the Court Determined the Class Arbitration Consent Issue on a De Novo Basis?

To test the soundness of the Jock IV Court’s conclusion, let’s assume that the Court should have determined on a de novo basis whether the absent class members consented to class arbitration, or, alternatively, whether the absent class members consented to be bound by Clause Construction and certification awards, which were made by arbitrators the absent class members had no part in selecting, and to which those absent class members did not consent after being given an opportunity to opt in to the class.

Lamps Plus requires clear and unmistakable consent to class arbitration. There is no possibility the arbitration agreements signed by the parties could satisfy that demanding requirement. As Jock I demonstrates, at most the Agreement was susceptible to an interpretation under which one might infer implied consent to class arbitration. But it was also susceptible to one or more other interpretations under which it contemplated only bilateral arbitration.

It was therefore ambiguous, and were the Court to have analyzed class arbitration consent on a de novo basis under Lamps Plus standard, then the Court would presumably have determined that the absent class members did not consent to class arbitration and therefore could not be made part of a class.

Did the Jock IV Court Err by Deeming the Absent Class Members to be Bound by the Clause Construction Award?   

The soundness of Jock IV thus depends on whether the absent class members’ signing of arbitration agreements identical to those signed by the Jock class representatives and opt-in class members can legitimately be construed to evidence their consent to be bound by a nearly-decade-old Clause Construction Award decided (a) by an arbitrator they played no part in selecting under (b) a legal standard that has been superceded by a 2019 United States Supreme Court decision (Lamps Plus). 

Continue Reading »

National Children’s Center, Inc. v. Service Employees Int’l Union: What Happens when an Arbitrator Interprets a Contract, but does not even Arguably Apply the Interpretation to the Parties’ Dispute?

October 20th, 2014 Arbitration Agreements, Arbitration Practice and Procedure, Authority of Arbitrators, Awards, Contract Interpretation, Grounds for Vacatur, Judicial Review of Arbitration Awards, Practice and Procedure, United States District Court for the District of Columbia, United States Supreme Court Comments Off on National Children’s Center, Inc. v. Service Employees Int’l Union: What Happens when an Arbitrator Interprets a Contract, but does not even Arguably Apply the Interpretation to the Parties’ Dispute?

Introduction

The deferential Enterprise Wheel/Stolt-Nielsen/Oxford contract-based outcome review standard the U.S. Supreme Court has applied to both labor arbitration awards under Section 301 of the Labor Management Relations Act, and commercial arbitration awards falling under the Federal Arbitration Act, is fairly simple to articulate yet often difficult to apply, especially in close cases.

In National Children’s Center, Inc. v. Service Employees Int’l Union, No. 13-1036, slip op. (D.D.C. Sep’t 19, 2014), United States District Court for the District of Columbia was faced with such a case, and the district court judge had to make a tough call. Applying the sometimes elusive standard, the Court concluded that the award had to be vacated. It was a close call— so close, in fact, that others may disagree and support their conclusions with what may appear to be compelling arguments.

On balance, we think the Court did the right thing given the somewhat unusual circumstances the case presented. But at least on some level it doesn’t matter. The district court judge did exactly what a good judge should do: she followed the law and, faced with the task of applying the law to a rather odd set of circumstances, she did so in the way she thought (and we agree) the law should be applied, even though the result was overturning an award.

It is quite likely that on remand the arbitrator will issue an award reaching the same conclusion and that the second award will be judicially enforced. While some might argue that vacatur should have been denied for expediency’s sake, that would not only have been the wrong decision, but a shortsighted one. Continue Reading »

Re Colorado Energy Management, LLC v. Lea Power Partners, LLC: Another Appellate Division holds Construction Arbitration Award should be Vacated, but this time for Good Reason

May 10th, 2014 American Arbitration Association, Appellate Practice, Arbitrability, Arbitration Practice and Procedure, Arbitrator Vacancy, Authority of Arbitrators, Awards, Construction Industry Arbitration, Functus Officio, Grounds for Vacatur, Judicial Review of Arbitration Awards, New York State Courts, Practice and Procedure, State Arbitration Law, State Arbitration Statutes, State Courts Comments Off on Re Colorado Energy Management, LLC v. Lea Power Partners, LLC: Another Appellate Division holds Construction Arbitration Award should be Vacated, but this time for Good Reason

Introduction

In our recent post on the Merion Construction case (here), we were pretty critical of New Jersey’s Superior Court, Appellate Division, for reversing a trial court decision confirming a modified arbitration award, finding it should have been vacated and the original award confirmed. Today’s post takes a brief look at a decision by another state’s Appellate Division—New York’s Supreme Court, Appellate Division, First Department—which held that another construction-industry award should be vacated.

In Merion Construction the New Jersey Appellate Division thought the arbitrator had no authority to correct his award to reflect the rulings he intended to make on two issues the parties had submitted to him. Re Colorado Management, LLC v. Lea Power Partners, LLC , ___ A.D.3d ___, ___, 2014 N.Y. Slip Op. 01253 at 1-3 (1st Dep’t Feb. 20, 2014), held that a final arbitration award had to be vacated because the arbitrator had no authority to rule upon an issue that was not presented to him in light of the parties’ submissions and a ruling made in the same proceeding by a predecessor arbitrator.

While Merion Construction got an “F,” Colorado Management gets at least an “A-,” and perhaps even an “A.” Continue Reading »

No Good Deed Should Go Unpunished: Functus Officio and Merion Constr. Mgt., LLC v. Kemron Environmental Serv., Inc.—Part I

May 3rd, 2014 American Arbitration Association, Appellate Practice, Arbitrability, Arbitration Agreements, Arbitration and Mediation FAQs, Arbitration Practice and Procedure, Arbitration Provider Rules, Authority of Arbitrators, Awards, Construction Industry Arbitration, Final Awards, Functus Officio, Grounds for Vacatur, Judicial Review of Arbitration Awards, New Jersey State Courts, Practice and Procedure, State Arbitration Statutes, State Courts, Uncategorized Comments Off on No Good Deed Should Go Unpunished: Functus Officio and Merion Constr. Mgt., LLC v. Kemron Environmental Serv., Inc.—Part I

Courts usually err in favor of not vacating awards in close cases. As a result, Courts usually vacate awards only where there is a very clear, fundamental disconnect between the award and the parties’ arbitration agreement. Vacating an award in those circumstances enforces the parties’ agreement to arbitrate, which is exactly what the Federal Arbitration Act (“FAA”) and state arbitration codes are supposed to do. (See, e.g., L. Reins. & Arb. L. Forum post here.)

Today’s case, Merion Constr. Mgt., LLC v. Kemron Environmental Serv., Inc., No. A-2428-12T4, slip op. (N.J. App. Div. March 13, 2014), involved two disputed awards: the original arbitration award (the “Original Award”) and a subsequent, modified award (the “Modified Award”). The arbitrator (the “Arbitrator”) issued the Modified Award to correct a mistake in the Original Award, which had inadvertently omitted items of claimed damage that one of the parties had requested the Arbitrator to award. The Arbitrator said he intended to include those damage items in the Original Award. The Modified Award thus accurately reflected the parties’ agreement and submission and the Original Award did not.

Which Award should have been confirmed? Relying on the functus officio doctrine, and an American Arbitration Association (“AAA”) Rule concerning arbitral modification and correction of awards, the intermediate state appellate court reversed a trial court judgment confirming the Modified Award, and held that the Original Award should have been confirmed.

A few years back the Chief Justice of the United States Supreme Court prefaced one his opinions with the following truism: “People make mistakes. Even administrators of ERISA plans.” Conkright v. Frommert, 559 U.S. 506, 509 (2010) (Roberts, C.J.). Had Merion Construction been decided correctly, then the New Jersey appellate court might have prefaced its opinion with a similar truism: “People make mistakes. Even arbitrators.” But based on how the case was decided a more fitting preface would have been: “No good deed should go unpunished. Even those perpetrated by arbitrators.” Continue Reading »

Stolt-Nielsen Oral Argument Analysis: Part III

December 23rd, 2009 Arbitrability, Authority of Arbitrators, Awards, Class Action Arbitration, Class Action Waivers, Consolidation of Arbitration Proceedings, United States Supreme Court 2 Comments »

On December 9, 2009 the United States Supreme Court held oral argument in Stolt-Nielsen, S.A. v. AnimalFeeds Int’l Corp., 548 F.3d 85 (2d Cir. 2009), petition for cert. granted June 15, 2009 (No. 08-1198) (oral argument transcript here).  Stolt-Nielsen concerns whether class or consolidated arbitration may be imposed on parties whose contracts are silent on that point, and we have written extensively on it, including an ongoing series of guest-post articles for our friend Karl Bayer’s  Disputing blog.  (Posts available here,  here, here, here, here, here, here, here and here.)  

On December 16, 2009 we posted Part II of our analysis of the oral argument (Parts  I, here, Part II, here).   In this Part III we focus on what transpired with respect to the second of four key interrelated issues raised at oral argument and identified in Part I:  What exactly did the arbitrators decide?  Continue Reading »

Stolt-Nielsen Oral Argument Analysis: Part II

December 16th, 2009 Arbitrability, Authority of Arbitrators, Class Action Arbitration, Class Action Waivers, Consolidation of Arbitration Proceedings, United States Supreme Court 3 Comments »

Introduction

On December 9, 2009 the United States Supreme Court held oral argument in Stolt-Nielsen, S.A. v. AnimalFeeds Int’l Corp., 548 F.3d 85 (2d Cir. 2009), petition for cert. granted June 15, 2009 (No. 08-1198) (oral argument transcript here).  Stolt-Nielsen concerns whether class or consolidated arbitration may be imposed on parties whose contracts are silent on that point, and we have written extensively on it, including a series of guest-post articles for the Disputing blog.  (Posts available here,  here, here, here, here, here, here, here and here.)  

Former Solicitor General Seth Waxman, a partner of the prestigious law firm of Wilmer Cutler Pickering Hale & Dorr LLP, and Chair of the firm’s Appellate and Supreme Court Litigation Practice Group, represented the Stolt-Nielsen petitioners before the Court (Mr. Waxman’s bio is here).  Georgetown University Law Center Professor Cornelia T.L. Pillard represented respondent AnimalFeeds.  (Professor Pillard also represented the Bazzle respondents in Green Tree Financial Corp. v. Bazzle, 539 U.S. 444 (2003)).  Both attorneys did a very admirable job of presenting their cases on behalf of their clients. 

On December 13, 2009  we posted Part I of our analysis of the oral argument (Part I here).   In this Part II we focus on what transpired with respect to the first of the four key, interrelated issues raised by the Justices and identified in Part I:  The scope of the submission and the corresponding scope of the arbitrators’ authority.  We shall address the remaining three in one or more future posts.  Continue Reading »

Global Arbitration Review Publishes Article on Hansen v. Everlast and Quotes Philip J. Loree Jr.

November 3rd, 2009 Arbitrability, Authority of Arbitrators, Awards, Functus Officio, New York Court of Appeals, Nuts & Bolts: Arbitration, Uncategorized, United States Court of Appeals for the Second Circuit Comments Off on Global Arbitration Review Publishes Article on Hansen v. Everlast and Quotes Philip J. Loree Jr.

Readers may recall our recent post on the New York Court of Appeals’ decision in Re Joan Hansen & Co v. Everlast World’s Boxing Headquarters Corp., ___ N.Y.3d ___, slip op. (Oct. 15, 2009), a case which demonstrates how important the parties’ submission is in determining arbitral authority.  The Court held that, after an award, a party cannot reopen an arbitration proceeding to request that the arbitrators decide an issue that had not previously been submitted to the arbitrators.  A copy of our post is here.  

On November 2, 2009 Kyriaki Karadelis of the U.K.-based trade publication Global Arbitration Review (“GAR”)  (website here) wrote what I thought was a concise and insightful article on the case.  And we would have said that even if she had not quoted some of our comments in her article!  But she did, and we’re flattered by that. 

With Global Arbitration Review’s permission, and with the required copyright disclaimer, we have posted the article as a “Slide Share Presentation” in my LinkedIn profile, which you can view by clicking here.  Also posted there (again with GAR’s permission and the required disclaimer) is a Global Arbitration Review Article on the United States Court of Appeals for the Second Circuit’s decision in  ReliaStar Life Ins. Co. v. EMC National Life Co., ___ F.3d ___, ___ (2009) (Raggi, J.) (blogged here and here), in which the United States Court of Appeals for the Second Circuit held that an arbitration panel was authorized to award under the bad faith exception to the American Rule attorney and arbitrator fees to a ceding company in a case where the parties had agreed that “[e]ach party shall bear the expense of its own arbitrator.  .  .  and related outside attorneys’ fees, and shall jointly and equally bear with the other party the expenses of the third arbitrator.”  We reported on GAR’s article concerning ReliaStar case here, which also quotes some of our comments on that case. 

We ask our readership to remember that GAR is a subscription-only publication and that it has copyrights in these posted materials.  GAR has authorized us to post them online and distribute them for marketing purposes, but that authorization does not extend to others not similarly situated.  Please do the right thing and respect GAR’s copyrights — GAR has to make a living just like the rest of us!     

Arbitration Nuts & Bolts: New York Court of Appeals Says the Submission Defines the Scope of the Panel’s Authority

October 26th, 2009 Arbitrability, Authority of Arbitrators, Functus Officio, New York Court of Appeals, Nuts & Bolts, Nuts & Bolts: Arbitration, Reinsurance Arbitration, Reinsurance Claims 2 Comments »

On October 15, 2009 The New York Court of Appeals decided Re Joan Hansen & Co v. Everlast World’s Boxing Headquarters Corp., ___ N.Y.3d ___, slip op. (Oct. 15, 2009) (here), a case which demonstrates how important the parties’ submission is in determining arbitral authority. The Court held that, after an award, a party cannot reopen an arbitration proceeding to request that the arbitrators decide an issue that had not previously been submitted to the arbitrators.

The power of arbitrators appointed to resolve a particular dispute or disputes is defined by the submission, not the arbitration agreement. The scope of the agreement to arbitrate tells us only what must be submitted to arbitration. It is the submission itself that “serves not only to define, but to circumscribe the authority of the arbitrators.” Ottley v. Schwartzberg, 819 F.2d 373, 376 (2d Cir. 1987) (here).   

As the United States Court of Appeals for the Fifth Circuit explained, a predispute arbitration agreement generally is “not self-executing” — “[b]efore arbitration can … proceed, it is necessary for the parties to supplement the agreement to arbitrate by defining the issue to be submitted to the arbitrator and by explicitly giving him the authority to act.”  Piggly Wiggly Operators’ Warehouse Inc v. Piggly Wiggly Operators’ Warehouse Independent Truck Drivers Union, 611 F2d 580 (5th Cir. 1980) (here).  The disputes presented to the panel for resolution without objection constitute the submission, which may be embodied in a formal submission agreement or determined from the arbitration demand in conjunction with the arguments and contentions made by the parties during the proceeding. Continue Reading »